| Parameter | Typical Range | Notes |
|---|---|---|
| Throughput Capacity | 500–20,000 tons/day | Varies by mineral and setup |
| Leaching Temperature | 20°C – 90°C | Low to moderate heat |
| Metal Recovery Efficiency | 85–98% | Depends on ore grade and process control |
| Energy Consumption | ~0.3–0.5 GJ/ton ore | Significantly less than smelting |
| Typical Chemicals Used | Sulfuric acid, Cyanide, Ammonia | Ore-dependent |
| Vendor | Plant Capacity | Specialization | Environmental Features | Price Range (USD) |
|---|---|---|---|---|
| HydroMetX Inc. | 1,000–15,000 t/day | Copper & Nickel ores | Advanced water recycling | $8M–$30M |
| EcoExtract Solutions | 500–10,000 t/day | Precious metals & e-waste | Bioleaching & low acid use | $6M–$25M |
| ReMetallurgy Corp. | 2,000–20,000 t/day | Industrial & tailings processing | Zero liquid discharge system | $10M–$35M |